{"id":21980,"date":"2022-09-05T15:33:06","date_gmt":"2022-09-05T15:33:06","guid":{"rendered":"http:\/\/shipip.com\/?p=21980"},"modified":"2022-09-05T15:33:06","modified_gmt":"2022-09-05T15:33:06","slug":"second-fully-electric-ferry-enters-service-in-kiel","status":"publish","type":"post","link":"https:\/\/developmenttask.com\/ShipIpLtd\/second-fully-electric-ferry-enters-service-in-kiel\/","title":{"rendered":"Second fully-electric ferry enters service in Kiel"},"content":{"rendered":"<p>Kiel, Germany, based ferry (and tugboat) operator\u00a0<a href=\"https:\/\/www.sfk-kiel.de\/en\/index.php\" rel=\"noreferrer noopener\">SFK<\/a>\u00a0has christened its second fully-electric ferry, the\u00a0<em>Wellingdorf.\u00a0<\/em>The 24.70 meters long by 7.20 meters wide ferry can carry 140 pedestrians and 60 cycles. It is a sister vessel to the previously delivered\u00a0<em>D\u00fcsternbrook<\/em>\u00a0and is the fifth in a series of four hybrid and two fully-electric vessels designed and built for SKF by Holland Shipyards Group. The final (hybrid) vessel in the series,\u00a0<em>Schilksee<\/em>, is expected to be delivered early 2026. The vessel is completely emissions-free and entirely powered by battery power with an installed capacity of 1,092 kWh. In addition to the Green Orca battery pack, supplied by Dutch marine battery system supplier\u00a0<a href=\"https:\/\/www.est-floattech.com\/\" rel=\"noreferrer noopener\">EST-Floattech,<\/a>\u00a0the vessel has 20 solar panels on the roof to serve the onboard power supply network.<\/p>\n<p>\u201cWhile almost all ferries referred to as \u2018fully-electric\u2019 still have backup power provided by a diesel engine, the Wellingdorf has no such backup and gets redundancies from the split battery system,\u201d says\u00a0<a href=\"https:\/\/www.marinelog.com\/?s=Holland+Shipyards+Group\" rel=\"noreferrer noopener\">Holland Shipyards Group<\/a>. \u201cThis means that the ferry propulsion really is all-electric.\u201d<\/p>\n<p>Another feature of the ferry is a non-conventional automated mooring system which features electric-hydraulically operated mooring hooks in both sides of the ship. The mooring system is easily controlled from the wheelhouse by the captain. While moored, no power has to be directed to the propulsion system, resulting in a reduction in energy consumption.<\/p>\n<p>SFK is renewing its fleet in line with the environmental goals set by the city of Kiel, which aims to be CO2 neutral by 2050 and expects shipping to play a major part in this shift.<\/p>\n<p>The\u00a0<em>Wellingdorf<\/em>\u00a0and\u00a0<em>D\u00fcsternbrook<\/em>\u00a0will operate on SKF\u2019s F2 Schwentinelinie.<\/p>\n<p>\u201cIt is particularly pleasing there will be two e-ferries commuting on the F2 Schwentinelinie in the future,\u201d said SKF managing director Andreas Schulz. \u201cThis means that this ferry line from Kiel\u2019s west shore to the east shore will basically be served all-electrically by the SFK vessels.\u201d<\/p>\n<p>\u201cPublic transport on the water will benefit from the new construction, as up to 140 passengers can get on board without barriers and we can also carry 60 bicycles that can be individually parked and removed,\u201d noted Schulz. \u201cPassengers can get on board quickly and conveniently via two 1.60 meter wide access ramps operated by the captain. There is only one deck, which is provided in the front area for the bicycles and in the rear area for the passengers, who can buy their tickets on board at a machine without cash.\u201d<\/p>\n<p>According to Shulz, with the storage capacity of the battery packs of 1,092 kilowatts per hour and photovoltaics (20 solar cells), the ship should be able to operate for around thirteen hours before it needs to be recharged, with appropriate charging infrastructure set up at the ferry piers and at SKF\u2019s workshop pontoon. Further technical equipment includes two electric propulsion motors, each rated at 86 kW, and a 40 kW independent bow thruster.<\/p>\n<p>The construction costs for the\u00a0<em>Wellingdorf<\/em>\u00a0were just under $3.2 million euros.<\/p>\n<p>Source: https:\/\/www.marinelog.com\/passenger\/ferries\/second-fully-electric-ferry-enters-service-in-kiel\/<\/p>\n<p>&nbsp;<\/p>\n<p><code><br \/>\n<\/code><\/p>\n<p><a title=\"CREWEXPRESS STCW REST HOURS SOFTWARE - Paris and Tokyo MoU have announced that they will jointly launch a new Concentrated Inspection Campaign (CIC) on Standards of Training, Certification and Watchkeeping for Seafarers (STCW) from 1st September 2022 to 30th November 2022\" href=\"http:\/\/shipip.com\/software\/crewexpress-stcw-rest-hours-software\/\" rel=\"noopener\"><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-full wp-image-20827\" src=\"http:\/\/shipip.com\/wp-content\/uploads\/2022\/08\/crewexpress-stcw-psc.jpg\" alt=\"CREWEXPRESS STCW REST HOURS SOFTWARE - Paris and Tokyo MoU have announced that they will jointly launch a new Concentrated Inspection Campaign (CIC) on Standards of Training, Certification and Watchkeeping for Seafarers (STCW) from 1st September 2022 to 30th November 2022 \" width=\"600\" height=\"200\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kiel, Germany, based ferry (and tugboat) operator\u00a0SFK\u00a0has christened its second fully-electric ferry, the\u00a0Wellingdorf.\u00a0The 24.70 meters long by 7.20 meters wide ferry can carry 140 pedestrians and 60 cycles. It is a sister vessel to the previously delivered\u00a0D\u00fcsternbrook\u00a0and is the fifth in a series of four hybrid and two fully-electric vessels designed and built for SKF [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[49,147],"class_list":["post-21980","post","type-post","status-publish","format-standard","hentry","category-general","tag-autonomous","tag-tokyo-and-the-paris-memoranda-of-understanding-mou-on-port-state-control-joint-concentrated-inspection-campaign-on-stcw"],"_links":{"self":[{"href":"https:\/\/developmenttask.com\/ShipIpLtd\/wp-json\/wp\/v2\/posts\/21980","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/developmenttask.com\/ShipIpLtd\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/developmenttask.com\/ShipIpLtd\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/developmenttask.com\/ShipIpLtd\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/developmenttask.com\/ShipIpLtd\/wp-json\/wp\/v2\/comments?post=21980"}],"version-history":[{"count":0,"href":"https:\/\/developmenttask.com\/ShipIpLtd\/wp-json\/wp\/v2\/posts\/21980\/revisions"}],"wp:attachment":[{"href":"https:\/\/developmenttask.com\/ShipIpLtd\/wp-json\/wp\/v2\/media?parent=21980"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/developmenttask.com\/ShipIpLtd\/wp-json\/wp\/v2\/categories?post=21980"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/developmenttask.com\/ShipIpLtd\/wp-json\/wp\/v2\/tags?post=21980"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}